References

Wesoła Municipality, Warsaw

2025 – NOW

The scope of work included:

  • Design of a BMS system for the school. The facility during use.
  • Costeffectiveness analysis in accordance with IPMVP.

Netto Poland

2025 – NOW

The scope of work included:

  • BMS automation for the Krasne Rzeszów store

Galaxy Shopping Centre in Szczecin

2025-NOW

The scope of work included:

  • Cooling tower automation. Design and implementation

2023 – 2024

The scope of work included:

  • BMS automation design
  • Delivery and installation of BMS and facility automation systems for premises
  • Automation for ventilation, air conditioning, refrigeration and heat distribution
  • BMS media reporting and billing system

Maritime University of Technology

2025 – NOW

The scope of work included:

  • Automation of a test bench for testing refrigeration systems

Terminal LNG Świnoujście GR3

2023 – 2025

The scope of work included:

  • Detailed design of HVAC control and instrumentation (AKPiA)

  • Supply of electrical switchboards

  • Installation work

  • Commissioning and software development

Radisson Międzywodzie

2023 – 2025

The scope of work included:

  • Design of the HVAC/R and hotel automation system

Poultry Slaughterhouse in Ciechanów

2023 – 2024

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • BMS software development

  • Reporting system

Elektryka Morska Office Building

2023 – 2024

The scope of work included:

  • AKPiA (control and instrumentation) system design

  • Software development

  • BMS system design

Shopping and Warehouse Center DINO 2

2023

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • BMS software development

Energy Modernization of the Hospital in Zielona Góra

2022-2023

The scope of work included:

  • Energy audit of the obstetrics and gynecology building

  • Preparation of a reconstruction concept for a public tender for a BMS system aimed at optimizing energy consumption

Polish Theatre in Szczecin

2018-2023

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • Development and commissioning of BMS software

FM Logistics Błonie

2022-2023

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • Development and commissioning of BMS software

Balancing Station, Szczecin District Heating Company

2022-2023

The scope of work included:

  • Improvement of automation systems at the facility

  • Development and commissioning of PLC software

Pomorzany Hospital in Szczecin

2022-2023

The scope of work included:

  • Design of the automation system for the cooling system and heat substation

Avenida Shopping Center Poznań – HalfPrice (CCC Group)

2022-Teraz

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • BMS software development

Pałac Saski in Kutno

2019-2022

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • BMS software development

FM Logistic Wistkitki

2022

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • BMS software development

TZMO Deutchland

2022

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS and PLC systems

  • Development and commissioning of BMS and PLC software

Orlen Research and Development Center in Płock

2021

The scope of work included:

  • Software development and commissioning of the critical flow system for the laboratory

  • Precision positive and negative pressure control system using Honeywell/Phoenix Controls solutions

CCC – Pilot Project for 4 Stores

2021

The scope of work included:

  • Development of energy-saving algorithms for HVAC/R systems

  • Implementation and testing

Hotel europejski in Warsaw (Accor Group)

2021-2022

The scope of work included:

  • Design of the hotel system modernization

  • Modernization of the hotel system – resolution of cabling issues

  • Verification of correct operation in all renovated rooms

  • Replacement of most PLC programs

  • Delivery of a new BMS system

  • Modernization of the chiller plant – design, PLC replacement, software delivery, and testing

  • Warranty service for the facility

Orlen – Pilot Station for Energy Saving

2022

The scope of work included:

  • BMS automation system design

  • Implementation of the automation system

  • Development and commissioning of BMS and PLC software

Shopping and Warehouse Center DINO

2022

The scope of work included:

  • BMS automation system design

  • Delivery of the BMS system

  • BMS software development

Opel Plant in Gliwice. Chiller Plant with Heat Recovery

2020-2021

The scope of work included:

  • Automation system design

  • Supply of PLC automation components

  • PLC software development

  • Warranty service

Cedrob Kosobudy Egg Hatchery (1,100,000 eggs/day)

2020-2021

The scope of work included:

  • SCADA/BMS system software development for managing the entire plant

Warszawa Rosoła – Sports Facility

2020

The scope of work included:

  • Automation system design

  • Supply of PLC automation components

  • PLC software development

Amazon Kołbaskowo

2020

The scope of work included:

  • Audit of the automation and BMS system

Formika Flexographic Workshop

2019

The scope of work included:

  • SCADA system software development for modernized installations

Cedrob Poultry Slaughterhouse (Ducks and Geese) in Kutno – Modernization

2019

The scope of work included:

  • SCADA system software development for modernized installations

Cedrob U3 Slaughter and Cutting Plant, Ujazdówek

2018-2019

The scope of work included:

  • Design of the glycol chiller plant

  • Design of the freezing plant and installation – ammonia and carbon dioxide

  • Commissioning and programming of the chiller plant

  • Commissioning and programming of the freezing plant and installation

  • SCADA system software development for HVAC/R installation management

Office Complex – Szczecin Storrady

2015

The scope of work included:

  • Software development and commissioning of 10 air handling units

  • Visualization system for the operation of ventilation systems